The new building was opened in the centre of Basel in 2016 opposite the main building. Kern Studer AG delivered the painting storage system for the warehouse in the basement. In order to meet the high quality requirements, we used our high-quality linear guide system in this case. The pull-out racks are designed with different lengths due to the special floor plan.
Year of construction: | 2015 |
System: | L-30 |
Number of pull-out racks: | 146 items |
Rack height: | 5000 mm |
Rack length: | 2800 - 5900 mm |
Hanging area | 5700 m2 |
Photos © Julian Salinas