Art museum Solothurn
Due to a lack of space and climate deficiencies in the existing storage facility, the Solothurn Municipal Building Office planned a new building. The existing art museum was expanded in 2016 to include the new cultural treasure protection room. This meets all conservation requirements and is located right next to the main building. Kern Studer AG delivered the painting storage system for the warehouse in the basement. The architect attached great importance to the appearance, which is why we used the ceiling-running system with high-quality aluminium rails.
Year of construction: | 2016 |
System: | DL-120 |
Number of pull-out racks: | 200 items |
Rack height: | 2440 mm |
Rack length: | 4335 mm |
Hanging area | 4230 m2 |